The operational pain
Shift production truth arrived late and manually. Cycle time lived in spreadsheets that froze under load. Efficiency numbers could be edited by hand. Supervisors could not see press status during the shift.
Proven Success
An anonymized, capability-first story from the factory floor. We show what was proven — and what we refuse to invent. This is evidence of module maturity, not Metron’s whole identity.
Illustrative sceneProven Success
No customer logo wall. An anonymized story of capabilities that reached real production and matured specific Metron modules.
Shift production truth arrived late and manually. Cycle time lived in spreadsheets that froze under load. Efficiency numbers could be edited by hand. Supervisors could not see press status during the shift.
Live cycle counting, a floor dashboard, and production activities closed with scrap — an honest path to A × P × Q.
In-shift intervention and efficiency accountability from machine activity — without invented savings percentages.
Validated activity path
Open a production activity for the shift
Live cycles from the press signal
Official efficiency only after close
Capability first
Status reflects field evidence. Industry is context; capability is the message.
Injection Molding
Injection Molding
Injection Molding
Injection Molding
Injection Molding
Visual proof
An illustrative view of the validated dashboard pattern — not a live plant feed, and not a fixed OEE uplift claim.
18.4s
Accepted
19.1s
Accepted
—
Idle
21.8s
Over
Visual of the field-validated dashboard pattern — not a live plant feed, and not an OEE uplift claim.
Edge cycle signal — illustrative only.
| Cycle time (illustrative) | Accepted band |
|---|---|
| Context | Edge cycle signal — illustrative only. |
OEE foundation
What was field-validated is the collection path — not an invented OEE uplift %.
From running / stopped press signals during the shift.
From counted cycles vs standard time — not mid-shift manual edits.
From activity close + scrap — official path after close.
Validated vertical
MENA · 2024–2025 · Field Validated
Prove live cycle counting on injection presses, tie counts to production activities, close activities with scrap, and build an honest path to OEE = Availability × Performance × Quality — without turning the whole platform into a cycle-time-only product.
Capability-first. No invented OEE uplift %. Not a Core default for every plant.
Bring one production line, its current data sources, and a priority loss. We will map the measurement, workflow, and proof of value.